Nov 202020
 

We had our delivery of fresh timber arrive today, this morning, but it turned out to be only fraction of what we ordered. There was some confusion back in the builders merchant yard and we only got 99 planks. We were expecting 448 planks, which supposed to be a complete pallet load. We are chasing […]

 Posted by at 8:30 am
Nov 042020
 

Suddenly at a bright early hour, our concrete beams, all ten of them, arrive! We had to parked them on our driveway in such a position so we could then transport each beam inside the house through the Side Door, without hitting problems like trying to turn a 4metre long object around a sharp 90degrees […]

 Posted by at 4:00 pm
Nov 022020
 

The first load of new building material arrived today. 576 dense concrete blocks arrived with a ton bag of soft sand, eight bags of cement, two large paving slabs and one concrete lintel. The remaining 74 blocks will be delivered soon, along with the 10 concrete beams. We are glad that we beat the lock-down […]

 Posted by at 4:30 pm
Oct 312018
 

Sometime during the afternoon, we had the delivery of the remaining four pallets of our slates and they were unloaded alongside our Loke, following the line as we intended, but alas, one of the pallets was dumped on top of two others! We did not want this, as we wanted to be able to take […]

 Posted by at 6:00 pm
Feb 072018
 

This afternoon, in the middle of our lunch hour (about 1:30pm), the Oak Timber arrived!! There were ten packs in total, in four stacks¬† on the back of the lorry. Also, on the back of the lorry, was a fork-lift truck which came down two steep ramps off the end! We were lucky that the […]

 Posted by at 5:01 pm