This afternoon, we continued with the clear up operation on the site, removing concrete “homemade” blocks, removing the Batter Boards around the outside and repairing the kitchen sewage pipe that got caught by the mini-digger bucket several months ago!

2016-09-14

2016-09-14

Tomorrow, we will continue with this tidy-up operation to remove last of the OSB boards and pre-fab shoots (we never used!) and  remove the excess soil and level up the areas between the foundation strips, giving each a good old run over with the petrol compactor plate. Then insert the last remaining temperature probe conduits and heat pump water loops too.