Skip to content
  • Sat. Jul 12th, 2025

Roselea

A DIY Selfbuild by Stephen, Shaun & Daphne

  • Home
  • About
  • Contact Us
  • Design
    • Electricity
    • Energy
      • Solar Electricity
      • Solar Thermal
    • First Floor
    • Garage
    • Ground Floor
    • Ground Works
    • Roof
    • Site
    • Ventilation
    • Walls
    • Water
      • Rain Water
      • Sewage
  • Find Us
  • Pictures
    • Material Samples
    • Temporary Building
  • Plans
    • Structural Engineer Apr 2013
    • Groundworks September 2010
    • Building control May 2010
    • Planning April 10
    • Planning October 09
    • Planning August 2009
  • Tasks
  • Webcam Feed
Build Progress Phase 4 Roof Timelapse Movies

Progressing Along the Back of the House!

Jul 17, 2018 Shaun

Today, with it being just slightly cooler than yesterday, we started working on covering the roof along the back of the house. We decided that because we could access any…

Build Progress Phase 4 Roof

Roof “H” Done and Prepared to Work on the Back of House

Jul 14, 2018 Shaun

Today, under a blazing Sun, we continued with the “H” section of our roof and got that finished by mid-afternoon. This now sees all the roof areas from “A” to…

Build Progress Phase 4 Roof Timelapse Movies

“G” All Finished and “H” Half Way There

Jul 13, 2018 Shaun

We resumed the work of covering our roof with plywood boards and we got the last complex rhomboid shape made and fitted up to finish off the “G” roof segment.…

Build Progress Phase 4 Roof Timelapse Movies

“F” and “G” Areas Almost All Covered

Jul 12, 2018 Shaun

With a slowly improving day with the Sun breaking out, we moved the mobile platform around the corner to start work on the “F” section of the roof. This is…

Build Progress Building Control Phase 4 Roof

We Had An Inspection Today!

Jul 12, 2018 Shaun

Today, this afternoon, we had our building control officer come along to give us a once over, see what we have done, showing him the rafters in our roof, and…

Build Progress Phase 4 Roof Timelapse Movies

“D” & “E” Completely covered

Jul 11, 2018 Stephen

In better weather we completed the boarding of Sections D & E. We are getting better at cutting boards the correct size first time. We have now covered 140 square…

Build Progress Phase 4 Roof

“D” and “E” Roof Segments Half Covered With Plywood

Jul 10, 2018 Shaun

Under a much cooler cloudy sky, we resumed our work on covering the “D” and “E” sections of the roof. We did two full rows, right up to the “F”…

Build Progress Phase 4 Roof

“B” and “C” Fully Completed and Now doing “D” and “E” sections

Jul 9, 2018 Shaun

Saturday and today (Monday), we carried on doing the roof and completed the little bit left to do on the “B” where the very top narrow row was filled in…

Build Progress Phase 4 Roof

Roof “A” All Complete and “B” Almost Done too

Jul 6, 2018 Shaun

We resumed the work on covering the roof rafters with plywood boards and we managed to get all of the “A” section completed and almost all of the “B” area…

Build Progress Phase 4 Roof

Another Nine Sheets Went Up Onto “A” Section

Jul 5, 2018 Shaun

It was a very hot blistering hot hot hot day today as we resumed covering the “A” portion of the roof and a bit of the “B” section too. We…

Posts pagination

1 … 38 39 40 … 148

Roselea

A DIY Selfbuild by Stephen, Shaun & Daphne

Proudly powered by WordPress | Theme: Newsup by Themeansar.

  • Home
  • About
  • Contact Us
  • Design
    • Electricity
    • Energy
      • Solar Electricity
      • Solar Thermal
    • First Floor
    • Garage
    • Ground Floor
    • Ground Works
    • Roof
    • Site
    • Ventilation
    • Walls
    • Water
      • Rain Water
      • Sewage
  • Find Us
  • Pictures
    • Material Samples
    • Temporary Building
  • Plans
    • Structural Engineer Apr 2013
    • Groundworks September 2010
    • Building control May 2010
    • Planning April 10
    • Planning October 09
    • Planning August 2009
  • Tasks
  • Webcam Feed