Trimming The Edges!
Today we took advantage of the clear weather to finally finish off the roof we put on 6 months ago! Mostly we have been waiting for the weather to get…
A DIY Selfbuild by Stephen, Shaun & Daphne
Today we took advantage of the clear weather to finally finish off the roof we put on 6 months ago! Mostly we have been waiting for the weather to get…
Today we started putting up the plaster boards in the temporary living quarters. We went straight along the back wall in one go with 8 sheets and then 3 sheets…
we sorted out the electrics to allow us to nail up the plaster boards. Currently the electric cable comes in from under the floor into the old storage shed and…
Yesterday and today we revealed our trap doors in the garden room. The laminated flooring covered everything up, all glued down, including the two trap doors! These doors allow us…
We have finished laying the laminated flooring! Day 3 – Monday 20th June The last 30% of the room took as long as the previous day’s work of covering 70%!…
We have started the job of laying down engineered laminated floor tiles in our Garden room. Day 1 – Saturday 18th June We prepared the tiles, slicing up 9 of…
Today we hired an industrial floor sanding machine. The sanding system is a drum about 250mm (10inches) wide and the heavy weight of the sander really made quick work of…
We have started sorting out the planks of Oak and selecting the best ones to do the frames in the windows. The four back windows are very similar in size…
We have the hot water tank installed! It was a tight fit in the corner and in hindsight the design of the walls in that corner, should have allowed for…
We continue to route and connect pipes together in and around the hot water tank corner. We made a drain valve connection with a piece of hose pipe and sealed…