the four walls of the shower cubicle has been assembled in the Garden Room. It is now waiting for the tray to be finished and the cubicle’s roof cut and varnished.

The shower’s tray was trimmed around the edges removing excess glass fibre (horrible stuff and very itchy!) and the surfaces rubbed down to remove any pieces of glass fibre sticking out. After the analysis of the samples, the white topcoat was applied all over and sugar sprinkled carefully on it over most of the area, only avoiding the drain hole and the edges.


Tomorrow it is the turn of the Heat Exchanger!

By Shaun

Leave a Reply