Today, in the morning, we finished off the 3rd and final pipe run. We bedded
it down with the gravel and used the laser level machine to determine and
make sure the slope is maintained all the way along the sewage pipe!!
Now we await for the building inspector, Ken, to come and have a look, and
with his approval, we will refill all the trenches back up!!!