Today, we finished off the re-assembly of the Energy Module number 4, with the placement of the thick insulation boards around the outside of the module and then the lid on top.

We did have to shift it slightly to make room for these side insulation boards but apart from that, everything went back in more or less.

Module-4-Repairs-Finished

Module-4-Repairs-Finished

The “mess” of everything lying out and about, all went back into the hole and the sandy soil put back on top!

Tomorrow, we resume doing the foundation trenches.