We did a little bit of work this morning before the rain became too heavy for us, scraping the area around the Utility Room working towards Bedroom 3 in the right back corner. We emptied the trolley of any soil to avoid that getting soaked and muddy!

2016-09-16

2016-09-16

Weather permitting, tomorrow we will continue with the scraping and levelling of whole footprint of the house, we will have to put down a “guide” rail so we can continue to use our timber scraper tool, to bridge the larger area between the concrete strips.

By Shaun

Leave a Reply