While it was wet outside, we continued with making pieces of the cellular framework matrix that will divide up the Floor Slab into lots of rectangular regions so that no cracks (hopefully) will form when it cures and then gets heated up and cools down again and again and again!
We put together a heap of readymade strips of various lengths (using the OSB 100mm wide pieces we produced the other day), plus another heap of strips ready to trimmed and fitted in place during the installation process.
Monday, we will have to sweep the water off the plastic if it is still there, and then start assembling the dividing framework right across the slab, and then insert the fluffy expansion boards in and around the appropriate areas.