Today, before the steel arrived, the soil around the perimeter of the house and it’s wall, continued to be levelled, covering up the rainwater pipework and making it smooth and relatively flat.
The area around the corner of the Swimming lane and the Garage was sorted out and made level, and will continue along the back pass Bedroom 3 towards the Great room.