Today, in some lovely sunshine but with a chilly wind, we concluded the installation of the five “N” rafters and twelve “K” rafters!

N1-to-N5-Installed

N1-to-N5-Installed

K1-to-K15-Installed

K1-to-K15-Installed



This, finally, at last, sees the end of manufacturing and installing of the full sized rafters all over the whole roof, adding up to a total of 176 rafters!!
One Big Phew! That was one long job!
But we are not finished yet ..
We have to build out the porches for the front door and for the back door plus also the conservatory dormer next!

By Shaun

Leave a Reply