Utility Disconnect
There are still two utility services connected to the Old Place, water and telephone. The electricity has been moved last November. For the water, we dug down near the meter…
A DIY Selfbuild by Stephen, Shaun & Daphne
Phase 2 is the massive clearance of our site.
There are still two utility services connected to the Old Place, water and telephone. The electricity has been moved last November. For the water, we dug down near the meter…
After all the analysis of design and everything, we come to a final list of plastic pipes, tubes and crates. It adds up to over £6500! The lion share are…
We have been working on building up a shopping list of all the plastic pipework, crates and other plastic items. We were told that the prices for these will be…