Sewage Processor Installation (First 2 days!)
Day 1 and Day 2 of the Installation of our Sewage Processor! Saturday Day 1 Finished off compacting the soil over the Leach field. The Sewage Processor’s location is calculated…
A DIY Selfbuild by Stephen, Shaun & Daphne
Day 1 and Day 2 of the Installation of our Sewage Processor! Saturday Day 1 Finished off compacting the soil over the Leach field. The Sewage Processor’s location is calculated…
The work continues .. .. Day 7 – Friday Finished off the sand layer to required depth (700mm). Marked out the trench lines ready for the 40mm stones. Day 8…
We had an email today from Dave, our Building Control Officer, saying that the Structual Engineering report on the Garage design is ok and he is happy so long as…
Dave our Building Control Officer came today to inspect our Leach field and the pipes. He said “OK” and that was that! Painless! So Far! He asked to see the…
We have been busy for the last week… On Friday we set out the trench lines for the leach field. Day 1 – Saturday Marked out and dug the first…