This afternoon, we started putting all the dirt and soil back into all the
trenches of our three sewage pipe runs. We began at the trench cutting
across our driveway, so that area can be made safe again for us and
visitors.

But we hit a slight problem with the petrol engine driven vibrating machine,
it wouldn’t run for any length and Stephen took it apart to clean out the
tubes and pipes etc. It now runs nice and smoothly again!!

Shaun was clearing the driveway of piles of dirt and also scraping a layer
of soil off the surface where silt have accumulated over the last few years
when we had a river of rain water washing down the Loke carrying dirt and
silt from the area, and depositing it on Our driveway!!

Tomorrow, we will get on with the filling process in earnest!

By Shaun

Leave a Reply