It has been raining quite heavily all day so far and it is not nice out there. Our half completed repair work on Module Number 3 is sitting there gaining water in the bottom of the open tank! We have about an inch of water so far and we will have to put on our wellie boots to continue with the work!!

Module-3-Repairs-Rain-Stops-Work

Module-3-Repairs-Rain-Stops-Work

But we can report that the major problem of flooding from the workshop and also off the Loke has seems to be markedly reduced due to our attempts in building barriers etc. Thank Goodness!! Also because we have dug away large trenches of sand and soil from behind the insulation panels, there is plenty of room for the rain water to absorb into the ground before reaching our module – Phew!

By Shaun

Leave a Reply