Inserted More Batter Boards and Anchors for all Foundation Trenches and Pads
Today, we finished off chopping and slicing points on about a hundred pegs, carried over from yesterday. They are short 500 mm long pieces using spare 63mm by 38mm timbers…
A DIY Selfbuild by Stephen, Shaun & Daphne
Today, we finished off chopping and slicing points on about a hundred pegs, carried over from yesterday. They are short 500 mm long pieces using spare 63mm by 38mm timbers…
Skipping lunch, we put back the batter board, L2, that was moved to allow the mini-digger to dig and pile up all the excess sand soil mixture from the excavation…
At Long Last, we have finished all 5 energy modules, all buried in the ground and all full of water. The only signs of their presence is the red white…
This morning, we finished off burying the last of our Energy Modules, Number 5, with sandy soil and covering it up too. The warning red/white hazard tape was wrapped around the…
Today, we finished off the installation of the insulation panels on top of our Energy Module Number 5. At the same time, we started pumping water into the module, we…
In a rain interrupted day of work, we finished assembling the Aquacell crates for Energy Module Number 5. Next we put down a plastic sheet to cover the top surface and…
We continued with Energy Module Number 5 with the start of the assembly of the actual module itself at last! But first, not forgetting this time, we put in the…