We finished off the tidying up task by removing the last lengths of shuttering and putting all the loose pieces back under cover in our Timber Storage. The used pegs (which are no longer usable) and broken boards we took to the bonfire corner up on Mount Sod ready for a day of wet showers to have our bonfire.

Shuttering-Removed

Shuttering-Removed

We also opened up one of our impromptu concrete block molds to see if it had worked. The resulting blocks are a little uneven but seem to be fine.

Concrete-blocks-removed-from-mould

Concrete-blocks-removed-from-mould

Tomorrow, we will move the piles of concrete blocks into strategic locations so that the 700 blocks will be in easy reach when we start building the wall!!

By Shaun