This morning, a shopping list is being made up containing the Steel parts that forms the Central Structural Framework that holds up the whole roof complex. There are RSJ, box beams and lots of plate materials.
We will start the construction of this framework when the Floor Slab is poured and had time to cure a week or so. It will be a case of having our scaffolding out and with strong rope and winches, to lift up these steel parts into place on top of their steel legs etc. a real case of a jigsaw being put together!!