This afternoon, we concluded the bulk tidy-up of the chunks of concrete rubble lying inside the Perimeter Wall, loaded into 4 wheelbarrows and transported down to our “rubbish” area, made up of large Ton bags which are now filled up with various waste rubble.
Half the concrete blocks that were used to weigh down the shuttering and expansion joints on the Floor Slab have been moved to sit on the Perimeter Wall, ready for the final move to the Swimming Lane to wait for use in later construction.