Today, while it was a damp horrible day (and also Shaun is restricted to light duties!), we worked in our workshop to cut and prepare the material pieces to build more rafters. We made more noggins (both straight ones and diagonal 45 degrees angled ones), using up lots of odd left-over length of timber we have lying around and made enough to complete all the remaining rafters to build (both “O” and “K” sections).
Then, we chopped up a series of CLS timber pieces to have ready the top and bottom flanges for the “O” rafters (we had already made a similar set for the “N” rafters last week!). Finally, we paired up all our remaining plywood webbing and sliced the 40 degrees angles that are for the “N” rafters.
Tomorrow, we will do the “O” plywood webbing which have a 45 degrees angled ends so we will need to modify our templates and get those webbings sliced too. Hopefully, we will also get to create these rafters too and allow them to dry overnight before we take them outside, if we get a lucky break in the weather and installed them up and finish off the roof over the Great Room – Hurray!