Today, in the morning, we did some odd jobs that were left over from the weekend, tidied up the workshop, repaired a puncture in one of our tyres for our medium flatbed trolley and service our air pump that provides oxygen to our septic processing unit.
In the afternoon, we decided that we would make a new protected storage area for our CLS timber which is now badly located outside our house and is in the way of us working on our Fascia and the roof. So using the left over piece of our white tarpaulin sheet, we fixed it to the corner of our Great Room, using the internal legs and horizontal strut and rope to secure it.

Start-of-Internal-wood-store

Start-of-Internal-wood-store


Tomorrow, we will build two layers of shelving, the lower one sitting on the concrete floor that will take the large number of the 63mm CLS timber lengths and a second cantilever shelf about shoulder height which will take the odd dozen or so remaining timber pieces we have left over and will be needed to for future jobs.

By Shaun

Leave a Reply