This morning, we finished off sanding and cleaning up the work we did yesterday on the Downpipe Channels, by removing excess glass fibre here and there and preparing them all for the final “top coat” resin layer.
The deep black resin is a special formulated resin with a bit of wax added. This causes the surface of the resin to “pull” itself into a very smooth finish which is ideal to make the rain water flow as quickly as possible.
The next job is to use our new liquid level device and set out our “L” wooden brackets all around the whole building to get the Fascia boards to be aligned at the same height everywhere!