We carried on with the “N”, “O” and “P” sections of the Fascia boards, getting the last two outside corners up and fitted (on the NO and OP corners) and screwed the Oak pieces into place.
After lunch, we tackled the three Downpipe Channels, for IJ, LM and MN inner corners, each taking an hour or so to complete. It was very hot work under the blazing sun, and the wind wasn’t really cooling at all, even though it was strong!
Tomorrow, we will do the last two Downpipe Channels (the temporary ones) for the conservatory where it would join to the “P” section (in the middle of it) and conclude all the Fascia right around the whole house.
Finally here’s a Time Lapse of yesterdays work.