Preparing Utility Room
One of the first jobs was to move the existing electricity control board from over beside the window and position it out of the way on the dividing wall between…
A DIY Selfbuild by Stephen, Shaun & Daphne
One of the first jobs was to move the existing electricity control board from over beside the window and position it out of the way on the dividing wall between…
With the days drawing in and as each room is completed, less and less daylight is reaching the inner hallways and they are getting gloomier and gloomier plus also part…
We resumed the work on Bedroom 3 with the Wall Boards. We switched over to the tongue and groove method of joining two boards together and it seems to be…
After having finished the floorboards for Bedroom 3, we can walk around much easier and inspect everything. We decided to swop out the cable conduits around the windows with our…
Continuing with Bedroom 3, this week we installed more various elements into the wall and floor structure to provide additional functionality to the operation within the room like, for example,…