The new raised Flower Bed is finally completed today. The Octagonal shaped constructed of dry bricks (without cement), a mixture of concrete driveway bricks and standard clay bricks. There are 7 layers all together.
It is about 10 square metre of bedding, surrounding the lid of the spectic tank and air vent pipe.
This flower bed is a temporary construction to rescue various plants from around the whole site before they were ruined by phase 3 – the contstruction of the main house!