Yesterday and today were spent levelling out areas alongside our Loke, so our building materials can be delivered and unloaded.

2 Packs of CLS timber in the middle

2 Packs of CLS timber in the middle

The Pack of Cement boards and 2 Pallets of Plywood at the end.

The Pack of Cement boards and 2 Pallets of Plywood at the end.

2 Pallets of Plywood here - near the Garage

2 Pallets of Plywood here - near the Garage


We want to make sure that we can access each of the materials at any time, so each zone needed to be pointing in the right direction.

For example, the long 4.8metres timber stacks will be slightly rotated so about 300mm is always exposed to allow a length of timber to slide pass other pallet loads of stuff!

 

We are now ready for the 1st delivery load !!