Roselea

A DIY Selfbuild by Stephen, Shaun & Daphne
  • Home
  • About
  • Contact Us
  • Design
    • Electricity
    • Energy
      • Solar Thermal
    • First Floor
    • Garage
    • Ground Floor
    • Ground Works
    • Roof
    • Site
    • Ventilation
    • Walls
    • Water
      • Rain Water
      • Sewage
  • Find Us
  • Pictures
    • Material Samples
    • Temporary Building
  • Plans
    • Structural Engineer Apr 2013
    • Groundworks September 2010
    • Building control May 2010
    • Planning April 10
    • Planning October 09
    • Planning August 2009
  • Tasks
  • Webcam Feed

Floor and Walls Constructed for Bedroom Two and Tech Cupboard

 Bedroom Two, Build Progress, Ground Floor, Phase 5, Tech Cupboard
Jan 152022
 

We started the new year of 2022, after we had our mini break, by resuming the construction of Bedroom Two. We needed to finish the floor and to that goal, we created our next air distributor module. Using more left-over floorboards, we made a triangular shape that takes in the incoming air through a 110mm […]

 Posted by shaun at 6:00 pm

Started on Technology cupboard and Electrical panel.

 Build Progress, Electricity, Ground Floor, Phase 5, Tech Cupboard
Oct 232021
 

Stephen wanted a solo project whilst Shaun in resting, so he started on the Tech cupboard. First the two walls next to the bathroom and Storage cupboard where boarded with OSB (using up a lot of small pieces to make solo handling easier and using up the accumulated offcuts). Then Fermacell was stapled and glued […]

 Posted by Stephen at 6:16 pm

Categories

  • Accidents
  • Air Ducting
  • Aquacell Modules
  • Automation
  • Bedroom One
  • Bedroom Three
  • Bedroom Two
  • Build Progress
  • Building Control
  • Ceiling
  • Chimney
  • Cladding
  • Compactors / Vibrators
  • Concrete
  • Conservatory
  • Damaged Goods
  • Delivery
  • Demolition
  • Design
  • Dumper truck
  • Earth Tubes
  • Electricity
  • Energy
  • Energy Modules
  • Entertainment Room
  • Equipment and Tools
  • Eves
  • External Jobs
  • Fascia
  • Fencing
  • Filtration Module
  • First Floor
  • Flood
  • Flooring
  • Foundations
  • Garage
  • Garden
  • General
  • Ground Floor
  • Groundworks
  • Guttering
  • Halls
  • Holiday
  • House
  • Ice and Snow
  • Illness
  • Injury
  • Insulation
  • Interior
  • Kitchen
  • Lighting
  • Maintenance
  • Materials
  • Mini Digger
  • Oak Timber
  • Orders and Procurement
  • Phase 1
  • Phase 2
  • Phase 3
  • Phase 4
  • Phase 5
  • Phase 6
  • Planning Permission
  • Porch
  • Rafters
  • Rain
  • Rainwater
  • Repair
  • Research & Testing
  • Reviews
  • Roof
  • Servicing
  • Sewage
  • Site
  • Site Clearance
  • Site Layout
  • Site Maintenance
  • Site Management
  • Skylights
  • Slates
  • Solar
  • Steelworks
  • Sterilising Module
  • Stoppage
  • Structual Calcs
  • Survey
  • Swimming Lane
  • Tech Cupboard
  • Technical Info
  • Temperature Probes
  • Temporary Accommodations
  • The Loke
  • Tidy Up
  • Timber
  • Timelapse Movies
  • Trolley (Large)
  • Uncategorized
  • Utilities
  • Utility Room
  • Walls
  • Water
  • Water Closet
  • Windows
  • Workshop

Archives

Admin

  • Log in
  • Entries RSS
  • Comments RSS
  • WordPress.org
© 2009 Stephen McGarry Suffusion theme by Sayontan Sinha