Skip to content
  • Sat. Aug 16th, 2025

Roselea

A DIY Selfbuild by Stephen, Shaun & Daphne

  • Home
  • About
  • Contact Us
  • Design
    • Electricity
    • Energy
      • Solar Electricity
      • Solar Thermal
    • First Floor
    • Garage
    • Ground Floor
    • Ground Works
    • Roof
    • Site
    • Ventilation
    • Walls
    • Water
      • Rain Water
      • Sewage
  • Find Us
  • Pictures
    • Material Samples
    • Temporary Building
  • Plans
    • Structural Engineer Apr 2013
    • Groundworks September 2010
    • Building control May 2010
    • Planning April 10
    • Planning October 09
    • Planning August 2009
  • Tasks
  • Webcam Feed
Build Progress Garage Phase 1

Toilet Gains Extra features!

Oct 12, 2011 Shaun

The toilet in the Garden Room now has a mirror (600mm high and 450mm wide) a flat plane of glass with no edging or bevel, just screwed up with four…

Build Progress Garage Phase 1

Garden Room (Kitchen) Shelves Up!

Oct 12, 2011 Shaun

All the shelves are now on their brackets in all locations around the Garden Room! The brackets were nicely dry from the oven. Just a little touch up job here…

Build Progress Garage Phase 1

Garden room Shelves All Painted

Oct 12, 2011 Shaun

We have completed the task of applying the full gloss coat to all 27 pieces of shelving for the Garden Room, acting as our temporary kitchen for the next two…

Build Progress Garage Phase 1

Garden Room Shelving

Oct 10, 2011 Shaun

The 27 pieces of shelving for the Garden Room was finished being sanded smooth this morning. All were vacuumed to remove all the dust and first half painted before lunch.…

Build Progress Garage Phase 1

Kitchen Final Coat & Shelves Prepared

Oct 10, 2011 Shaun

The second coat of Oil White paint was applied to the various surfaces that were painted the day before. The shower cubicle is now a gloss white along with the…

Build Progress Garage Phase 1

Smoke & Fire Detection Installed

Oct 10, 2011 Shaun

The Smoke and Fire detectors have been wired up and connected into the lighting circuit. All are linked together and seems to be in working order with the pressing of…

Build Progress Garage Phase 1

Kitchen Painted White

Oct 9, 2011 Shaun

All the bare wooden surfaces were painted white. The air ducting, the shower cubicle, the covers over the hot tank and air con unit and the shelves under the sink…

Build Progress Garage Phase 1

toilet Sliding Doors put back!

Oct 7, 2011 Shaun

This morning we put back the sliding doors for the toilet in the Garden Room. They were given a clear coat of varnish a little while ago. We changed the…

Build Progress Garage Phase 1

Garden Room Shelves

Oct 7, 2011 Shaun

We calculated what shelves we needed in the Garden Room to provide storage space while the room is being used as the kitchen. It turns out to be two 300mm…

Build Progress Garage Phase 1

Covers On!

Oct 6, 2011 Shaun

The compartments where the hot water tank, air ducting and chimney, and fan lies, are now all covered up! They just need a coat of paint!

Posts pagination

1 … 113 114 115 … 148

Roselea

A DIY Selfbuild by Stephen, Shaun & Daphne

Proudly powered by WordPress | Theme: Newsup by Themeansar.

  • Home
  • About
  • Contact Us
  • Design
    • Electricity
    • Energy
      • Solar Electricity
      • Solar Thermal
    • First Floor
    • Garage
    • Ground Floor
    • Ground Works
    • Roof
    • Site
    • Ventilation
    • Walls
    • Water
      • Rain Water
      • Sewage
  • Find Us
  • Pictures
    • Material Samples
    • Temporary Building
  • Plans
    • Structural Engineer Apr 2013
    • Groundworks September 2010
    • Building control May 2010
    • Planning April 10
    • Planning October 09
    • Planning August 2009
  • Tasks
  • Webcam Feed