Skip to content
  • Sun. Jan 18th, 2026

Roselea

A DIY Selfbuild by Stephen, Shaun & Daphne

  • Home
  • About
  • Contact Us
  • Design
    • Electricity
    • Energy
      • Solar Electricity
      • Solar Thermal
    • First Floor
    • Garage
    • Ground Floor
    • Ground Works
    • Roof
    • Site
    • Ventilation
    • Walls
    • Water
      • Rain Water
      • Sewage
  • Find Us
  • Pictures
    • Material Samples
    • Temporary Building
  • Plans
    • Structural Engineer Apr 2013
    • Groundworks September 2010
    • Building control May 2010
    • Planning April 10
    • Planning October 09
    • Planning August 2009
  • Tasks
  • Webcam Feed
Build Progress Phase 4 Rafters

All three of the remaining LVL Special Rafters are Created

Sep 22, 2017 Shaun

Today, following from yesterday’s job of preparing for NO and OP rafters, we sanded and vacuumed these two rafters so it all came together and got glued and nailed tight…

Build Progress Phase 4 Rafters

Final Set of Special Rafters Being Put Together

Sep 21, 2017 Shaun

Today, in lovely sunshine, we started to get the final set of special LVL rafters created. We first went outside to install the three corner legs for MN, NO and…

Build Progress Phase 4 Rafters

Sliced Polystyrene Sheets into Strips

Sep 20, 2017 Shaun

And in the afternoon, we finished off slicing all the remaining polystyrene sheets into 250mm wide by 38mm thick strips. The 14 boards were sliced (using our hot-melt wire machine)…

Build Progress Phase 4 Rafters

O Ridge is Installed!

Sep 20, 2017 Shaun

This morning, we finally managed to get out there and get the big heavy O Ridge rafter installed!! We checked to how dry the rafter was and brushed off the…

Build Progress Phase 4 Rafters

Preparing Materials for Creating Regular Rafters

Sep 18, 2017 Shaun

We spent the day inside our workshop to avoid more rain. It has been quite wet these last few days and we are having to do other work while we…

Build Progress Guttering Oak Timber Phase 4 Windows

Quantifying the amount of Oak Planks

Sep 16, 2017 Shaun

Today was spent on the computers, looking at the guttering, the facia and the windows, to decide on what kind of Oak we will need, what size and how much.…

Repair Roof Temporary Accommodations

Replaced Missing Roofing Felt on Living Quarter’s Roof

Sep 15, 2017 Shaun

Because of the bad weather coming later in the day and also more bad weather forecasted for the next three days too, we decided to tackle the small job of…

Repair Roof

Roof of the Wendy House Covering the Stack of OSB and Cement Boards Was recovered

Sep 15, 2017 Shaun

One of the little job we did today was to recover the tarpaulin roof of the Wendy House (the rain protection for our stack of OSB sheets and cement boards).…

Rafters Rain Stoppage

Postponed O Ridge Installation!

Sep 15, 2017 Shaun

Starting really early this morning, at round 8:30am, to avoid the incoming thunderstorm front, we went outside to have a go at installing our latest created rafter, this time, the…

Build Progress Phase 4 Rafters

O Ridge Parts Are Married Together!

Sep 13, 2017 Shaun

Today, we tidied up the two sections of the O Ridge rafter by running the power planer along all the edges, the top and bottom edges. This made sure that…

Posts pagination

1 … 59 60 61 … 149

Roselea

A DIY Selfbuild by Stephen, Shaun & Daphne

Proudly powered by WordPress | Theme: Newsup by Themeansar.

  • Home
  • About
  • Contact Us
  • Design
    • Electricity
    • Energy
      • Solar Electricity
      • Solar Thermal
    • First Floor
    • Garage
    • Ground Floor
    • Ground Works
    • Roof
    • Site
    • Ventilation
    • Walls
    • Water
      • Rain Water
      • Sewage
  • Find Us
  • Pictures
    • Material Samples
    • Temporary Building
  • Plans
    • Structural Engineer Apr 2013
    • Groundworks September 2010
    • Building control May 2010
    • Planning April 10
    • Planning October 09
    • Planning August 2009
  • Tasks
  • Webcam Feed