Skip to content
  • Tue. Aug 12th, 2025

Roselea

A DIY Selfbuild by Stephen, Shaun & Daphne

  • Home
  • About
  • Contact Us
  • Design
    • Electricity
    • Energy
      • Solar Electricity
      • Solar Thermal
    • First Floor
    • Garage
    • Ground Floor
    • Ground Works
    • Roof
    • Site
    • Ventilation
    • Walls
    • Water
      • Rain Water
      • Sewage
  • Find Us
  • Pictures
    • Material Samples
    • Temporary Building
  • Plans
    • Structural Engineer Apr 2013
    • Groundworks September 2010
    • Building control May 2010
    • Planning April 10
    • Planning October 09
    • Planning August 2009
  • Tasks
  • Webcam Feed
Energy Modules Groundworks Repair

Module Number 3 Repair – Day 3

Jun 25, 2016 Shaun

 Today, we finished off the job of resetting and re-establishing Energy Module Number 3 back into working order again. we dug out behind one of the ends to allow us…

Rain Stoppage

Rain Stops Work on Repair of Module Number 3

Jun 23, 2016 Shaun

It has been raining quite heavily all day so far and it is not nice out there. Our half completed repair work on Module Number 3 is sitting there gaining…

Energy Modules Groundworks Repair

Module Number 3 Repair – Day 2

Jun 22, 2016 Shaun

 We continued with our repair of the Energy Module Number 3. We have managed to rescue the remaining crates, the rubber membrane and the geotextile fabric The we lifted the insulation…

Energy Modules Groundworks Repair

Module Number 3 Repair – Day 1

Jun 21, 2016 Shaun

Today, we started the chore of digging  out the Energy Module Number 3 to reset it back down into the ground at the correct flat level again (after the flood…

Fencing Flood Site

Prevention Flood off Loke

Jun 18, 2016 Shaun

 In damp weather, we tackled the next source of flooding, this time coming off the Loke as the rain water collects together off the surface of the loke and some…

Rain Repair Site

Flood Prevention Attempt Number 2!

Jun 17, 2016 Shaun

 Today, we attempted to block off the rain water spillage coming from the workshop. See the little movie of the “river” gushing out of their workshop area (river starts at…

Rain Stoppage

Cloud Burst Upon Us!

Jun 16, 2016 Shaun

 We were driven in by a sudden rain shower! it was very heavy and we have already 8mm of rain in just the 20 minutes we had so far as…

Build Progress Energy Modules Groundworks Phase 3

Number 4 All Done!

Jun 16, 2016 Shaun

 This morning, we connected the conduit pipes and inspection tube down into the Number 4 Energy Module. Then we pushed in the remaining sand / soil from around the hole…

Energy Modules

Filled with Water and Holding So Far!

Jun 15, 2016 Shaun

We carried on with the task of filling our Energy Modules with water. Today, we finished filling Number 2 and started on filling Number 4 modules. The water in Number…

Build Progress Energy Modules Groundworks Phase 3

Number 4 Module Almost Finished!

Jun 15, 2016 Shaun

 Today, we put on the insulation panels around the number 4 Energy Module. We inserted at least 300 mm thick of insulating boards, more like 350mm to 380mm thick! We…

Posts pagination

1 … 94 95 96 … 148

Roselea

A DIY Selfbuild by Stephen, Shaun & Daphne

Proudly powered by WordPress | Theme: Newsup by Themeansar.

  • Home
  • About
  • Contact Us
  • Design
    • Electricity
    • Energy
      • Solar Electricity
      • Solar Thermal
    • First Floor
    • Garage
    • Ground Floor
    • Ground Works
    • Roof
    • Site
    • Ventilation
    • Walls
    • Water
      • Rain Water
      • Sewage
  • Find Us
  • Pictures
    • Material Samples
    • Temporary Building
  • Plans
    • Structural Engineer Apr 2013
    • Groundworks September 2010
    • Building control May 2010
    • Planning April 10
    • Planning October 09
    • Planning August 2009
  • Tasks
  • Webcam Feed