The final day, well not quite but near enough as the air is now pumping into the processor very nicely!
Day 6 – Saturday 17th July
Cut a narrow trench for conduit holding the air pipe from our temporary building to the processor.
We were interrupted for half an hour by the sharp thunder storm (10:45am). Filled the trench and also finished filling over the processor unit with soil to the metal cover level. Added two more 3metre segments with a 90 degrees bend up! Filled in the Trench so we can get the car out again!!
That’s That done! Now for the smelly job .. .. diverting the old pipes and connecting them into the new marvellous processing system!