We got back to finishing off the Shower cubicle today. We wired up a switched fuse electrical unit to allow us to isolate any of the equipment in and around the shower cubicle (lighting, the data recorder and the shower pump itself).
Various water pipes were connected on the back of the cubicle before it was pushed finally into it resting place.
And finally a lid is being made for the heat exchanger!