We moved all the 120 concrete blocks over to the slab, spread out along the
whole length (22.5metres), ready to build up 2 layers of the back wall, and
the extras at the beginning, ready for the end section of the swimming lane,
and the first few blocks on the front wall.
We used our new purposed built trolley to move 10 blocks at a time, weighing
in at least 250kg in total, pushing and pulling the load over the slightly
soggy ground (we had a recent rain fall!) and rather bumpy at times too.
Hard Work!