Today, we did the 1st of three sewage pipes that needs to be laid in and
under the house, before we put in the foundations and floor slab.

Pipe-3-Laid

Pipe-3-Laid

This was a short one, from the kitchen and running more or less along the
front of the house nearest to the Loke and terminating into the man hole
junction just before the drive way.

It has to be buried, starting at the kitchen end, 750mm below ground, and
falling away downhill at the normal “specs” of 1 in 40 slope to arrive at
the man hole junction point at 950mm deep. That was the easier one to do!
Tomorrow, weather permitting, will be the one that has to go across the
drive way and has two bends in it too!

By Shaun