This morning, we connected the conduit pipes and inspection tube down into the Number 4 Energy Module. Then we pushed in the remaining sand / soil from around the hole and covered it all up.

Module-4-Finished

Module-4-Finished

Finally, we pegged out the red and white warning tape to enclose the area, to prevent accidental “driving” over the module!

By Shaun

Leave a Reply