This morning, we connected the conduit pipes and inspection tube down into the Number 4 Energy Module. Then we pushed in the remaining sand / soil from around the hole and covered it all up.
Finally, we pegged out the red and white warning tape to enclose the area, to prevent accidental “driving” over the module!