Today, working in damp softened soil, we carried on with the scraping of the soil inside the footprint of the house. We finished off Bedroom 3 and the front half of the Hall way, plus removed a huge amount of soil from Bedroom 2 too!
On Monday, we will carry on scraping backwards towards Bedroom 3 (from the Entertainment room) and through to the back Perimeter wall, and continuing to the Kitchen and Bedroom 1 areas.