With the wind picking up a bit on this clear Monday morning, we resumed going around the steel I-Beams and installing the timber support pieces.

Timber Rafter-Supports-on-other-side

Timber Rafter-Supports-on-other-side

It is virtually the same as the work we did on Saturday and we now have completed the full circuit.

We have a line of wooden timber pieces on top of the steel work and a complete loop of special  timber pieces with slots sliced into them, fixed down on the lower flange, ready for the roof rafters to go in.

Tomorrow, we now can resumed doing our cement board wall coverings, first putting up a narrow strip and then the 3rd line of full height 1200mm cement sheets to complete the wall covering and structural racking.

By Shaun

Leave a Reply