Today, we finished off creating the new Covered Storage Area while it was raining gentle showers all day. A chest high line of “arms”, six of them, are now mounted and braced so we can load it up with miscellaneous lengths of timber. The three sleepers on concrete blocks underneath will take all the remaining 63mm CLS timber lengths we have got.
The old storage tent that was situated out near our Loke, has been taken down and tidied up.
The tarpaulin will have to be sorted out and where it has ripped, we will throw those bits away but any decent pieces we will keep. In fact, we will use several pieces to cover up the windows in our new Storage area to keep off driving rain blowing in a window!!
Tomorrow, we will dismantle and move the pallet of the 63mm CLS timber from outside the house, to inside the house and that will clear up access for our scaffolding tower when we are working on the roof, plus also make more room for more deliveries like the slate tiles and timber cladding when we get them.