After skipping the first day of the new week because of some appointments, the next three days we went around tidying up the house after we had finished the Entertainment Room, dismantling the wooden platforms that were still inside the room. We also cleaned up all the mortar spillage that had dropped down to the floor and swept all the rubbish out.

Tidy Up and Replace Lighting Units Plus Installed New Camera System

EntRoom-Shell-Finished-1

Tidy Up and Replace Lighting Units Plus Installed New Camera System

EntRoom-Shell-Finished-2

Tidy Up and Replace Lighting Units Plus Installed New Camera System

EntRoom-Shell-Finished-3

Tidy Up and Replace Lighting Units Plus Installed New Camera System

EntRoom-Shell-Finished-4



Next was to replace the burnt out floodlight we had up on the Skylight and put up eight new smaller 100W LED lighting units. We put two in the Utility Room which is becoming our new Tools area. Then mounted the remaining six units around the Skylight area, near each metal support leg, and rotated the existing 300W LED floodlight more horizontally to illuminate our workshop area down in the Great Room.
Tidy Up and Replace Lighting Units Plus Installed New Camera System

New-work-lights-1

Tidy Up and Replace Lighting Units Plus Installed New Camera System

New-work-lights-2



The third thing that happened this week, was the installation of our new camera system. A dedicated recorder box and a couple of 4K cameras. We put the recorder in the Utility Room and then ran a cable all the way down to the other end and up into the rafters to mount the camera as high as we could reach, to look down length of the house. We now can view and record all our work on building the internal rooms and also the first floor rooms too. The second camera is being held as a spare for the time being but it is likely to be employed later on when we start doing individual rooms and will mount it on a upright stand and capture what we are doing.
Tidy Up and Replace Lighting Units Plus Installed New Camera System

New-camera-Daylight

Tidy Up and Replace Lighting Units Plus Installed New Camera System

New-camera-Nightlight



The last thing that happened on Thursday late afternoon, was the arrival of the remaining CLS timber we wanted, see Second Delivery of CLS Timber Arrives it took us until Friday lunch time to move all of it into the house.

By Shaun