Today, we carried on with the tidy up operation around the base of the Perimeter Wall, to remove leaves, rubble and dirt that has been blown in these last few months.

Cleaning-up-inside-the-walls

Cleaning-up-inside-the-walls

We managed three quarters of the way round so far and have filled up 3 heavy duty rubble sacks. Tomorrow, we will finish off the last little bit and then we can start marking out the line where the inner wooden footplate will be bolted down to the concrete floor. This inner footplate will hold and lock down the second leg of the wall structure which is connected to the first “front” leg. When we have one made, a photo will describe this particular structural element with a bit more clarity!