We had a slow start today as we had a series of short sharp thunderstorms and showers with a twirling strong breeze so didn’t get going until about 11am. We did as much as we could on the “P” section of the roof on this side of the “Q” roof (the section facing backwards towards the Swimming Lane) and then moved the mobile platform tower along to the very front of the building and we carried on the other side of the “Q” (the Conservatory) and did the first row of with the posh plywood on the smaller last section of the “P” roof. And finally, we installed the three rows to cover the second half of the “Q” section. It is a bit more tricky as there isn’t a lot of room to work in.

Roof-boarding-Day-20-Continuing-P-Q

Roof-boarding-Day-20-Continuing-P-Q

Roof-boarding-Day-20-Continuing-P-Q

Roof-boarding-Day-20-Continuing-P-Q



So on Monday, we should get the rest of the “P” roof done and that will be definitely that! Not Bad at all!