Air Tunnel Construction Started!
After we have finished the sewage pipes (the filling in of their trenches), we started with the adjustment to the Earth Tube Mixing Chamber and the Air Supply Tunnel construction.…
A DIY Selfbuild by Stephen, Shaun & Daphne
After we have finished the sewage pipes (the filling in of their trenches), we started with the adjustment to the Earth Tube Mixing Chamber and the Air Supply Tunnel construction.…
Today, again with marvellous weather, we finished filling in the trenches that has the sewage pipelines in. The trench cutting across the driveway and footpath was carefully layered with regular…
This afternoon, we started putting all the dirt and soil back into all the trenches of our three sewage pipe runs. We began at the trench cutting across our driveway,…
This morning, we mixed up 3 bags of cement and 18 buckets of ballast and poured the lot into the open area we had all stuttered and ready. This slab…
Today, while we waited for the building control inspector to visit us, we got on with making adjustments to the Earth Tube Mixing Chamber. We had originally constructed it several…
This afternoon, our building control inspector, Ken, came along and look at our sewage lines. He went around asking questions about what that line is for and what this sewage…
Today, in the morning, we finished off the 3rd and final pipe run. We bedded it down with the gravel and used the laser level machine to determine and make…
Today, in glorious sunshine for most of the day, we completed the 2nd line of sewage pipes and got it bedded down in gravel before any further possible collapses of…
We have dug out the trench for the second sewer pipe today. We dug most of it by hand as it was shallow and easy to dig. We stopped when…
Today, we started the more difficult sewage pipeline, the one that is running across our driveway. It was tight to get the mini-digger in pass the garden shed, the air…