Garden Room – Upper Walls covered Up!
It was a long day today working on covering up the upper sections of the walls in the Garden Room. In some ways it went fairly easily but having to…
A DIY Selfbuild by Stephen, Shaun & Daphne
The Garage
It was a long day today working on covering up the upper sections of the walls in the Garden Room. In some ways it went fairly easily but having to…
Today the bottom half of the walls in the Garden Room was covered in the Fermacell boards. We went right around the room, skipping the doorways and jumping pass the…
The WC today has its Fermacell panels stapled up. It was a bit tricky with the smallness of the room, trying to get full size boards into the doorway and…
The WC walls now have their 18mm OSB Boards nailed up! The sliding door system is up and rolling. The two halves of the doors are hanging nicely, very nicely!…
We have started putting up the OSB wall boards at last! We have inserted all the conduit pipework inside the walls down from the Utility Rail (and one upwards!). we…
We have been spending the last couple of weeks on constructing the floor in the Garden Room. Plus laying and routing all the required pipes and conduits around the edges…
we have mapped out the various pipework, cables and other conduits that has to travel around under the floorboards including a fresh air channel to connect all the Earth Tubes…
We have finished putting up the Fermacell panels up on the ceiling of the Garden Room. The system of routing a tongue and groove seems to be working but the…
The last week has been a long process of moving and sorting all the bits and pieces stored in the old workshop and moving it all into the garage. We…
We sliced up a sheet of 18mm Plywood we had in our stack of sheet wood, it is rather dirty and got loads of screws holes but we thought we…