Hallway Cavities Insulated and Mains Electric Installed
The week was spent installing a layer of insulation inside the cavity under the hall’s flooring. We wanted to make sure that we don’t have too much leakage of valuable…
A DIY Selfbuild by Stephen, Shaun & Daphne
The week was spent installing a layer of insulation inside the cavity under the hall’s flooring. We wanted to make sure that we don’t have too much leakage of valuable…
Stephen wanted a solo project whilst Shaun in resting, so he started on the Tech cupboard. First the two walls next to the bathroom and Storage cupboard where boarded with…
This week we finished cutting hatches into the hall floors on Monday and Tuesday. Then we needed a way of lifting the panels easily. So we drilled a hole 100mm…
For this rather truncated week of work, we resumed the task of laying down the floorboards after a week of building the framework. One of the first things we did…
This week (apart from one day on Friday lost due to other commitments) was spent constructing the complicated framework for supporting the remaining Hallways, going up to the Great room,…
We got the week going by taking our slab of OSB board we cut last week for the worktop in the Utility Room and cutting a large hole in the…
The week started with the autumn’s annual task of the Sun Shield Taken Down and Thrown Away which occupied Monday morning. Then, it was a case of continuing on with…
We resumed work on our “Engine Room” within the Utility Room this week by putting on the thick heavy roof to the equipment cupboard. It is three layers of the…
At the beginning of the week, we finished off preparing the Utility Room by concluding the task of putting up OSB wall boards around the door and then trimmed the…
We arrived for this new week to resume our work on preparing the Utility Room, to get it ready for installing the vast collection of equipment, tanks, switches, pipes and…