The 5th and final day of Smoothing the Ground ready for Floor Slab
For the first half of the day, we finished off scraping and leveling off the remaining section of the Great Room. We are all completely done now, the whole area…
A DIY Selfbuild by Stephen, Shaun & Daphne
For the first half of the day, we finished off scraping and leveling off the remaining section of the Great Room. We are all completely done now, the whole area…
With slightly cooler weather, we carried on with the task of scraping and clearing away the excess sand and soil from all the ground between the foundation strips. We did…
Today, working in damp softened soil, we carried on with the scraping of the soil inside the footprint of the house. We finished off Bedroom 3 and the front half…
We did a little bit of work this morning before the rain became too heavy for us, scraping the area around the Utility Room working towards Bedroom 3 in the…
Today, we carried on with the tidying up task of removing the batter boards, disassembling the unused concrete shoots, collecting up all the rubbish and any other miscellaneous items left…
This afternoon, we continued with the clear up operation on the site, removing concrete “homemade” blocks, removing the Batter Boards around the outside and repairing the kitchen sewage pipe that…
This morning, under a baking sun (temperature reached almost 30°C in the shade), we finished off the 2nd coat of the Bitumen waterproof treatment of the Perimeter Wall, around the…
This morning, under a blanket of white clouds, we carried on with the bitumen painting of the Perimeter Wall, from the back corner of the Great Room and along the front…
Today, we started the task of applying the bitumen paint to the outside surface of our Perimeter Wall to make it waterproof against damp and floods. The morning was spent…
This morning, before the rain came along, we started clearing the area inside our building of all the rubbish and equipment plus chairs and table etc. to get the whole…