Skip to content
  • Fri. Aug 15th, 2025

Roselea

A DIY Selfbuild by Stephen, Shaun & Daphne

  • Home
  • About
  • Contact Us
  • Design
    • Electricity
    • Energy
      • Solar Electricity
      • Solar Thermal
    • First Floor
    • Garage
    • Ground Floor
    • Ground Works
    • Roof
    • Site
    • Ventilation
    • Walls
    • Water
      • Rain Water
      • Sewage
  • Find Us
  • Pictures
    • Material Samples
    • Temporary Building
  • Plans
    • Structural Engineer Apr 2013
    • Groundworks September 2010
    • Building control May 2010
    • Planning April 10
    • Planning October 09
    • Planning August 2009
  • Tasks
  • Webcam Feed
Build Progress Demolition Phase 2 Timelapse Movies

Days 6 to 14 of House demolition Time Lapse movies

Mar 24, 2012 Stephen

Here are a few more days of timelapse movies for your delectation…

Build Progress Demolition Phase 2

Pebble Dashed Rendering Removed!

Mar 24, 2012 Shaun

The week’s work of bashing and ripping off the pebble dashed rendering has finished at last! The ground, the paved footpath, all the way round the Old Place has a…

Build Progress Demolition Phase 2

Roof Tiles all Off

Mar 20, 2012 Shaun

I don’t know what day number it is anymore! Half a day there and half a day here! Anyway all the roof tiles are now off the Old Place! It…

Build Progress Demolition Phase 2 Timelapse Movies

Days 3,4 & 5 Of The House Demolition

Mar 12, 2012 Stephen

Nothing much done on Saturday as Shaun was feeling ill all day (very unusual)… So Stephen just fixed a saftey rope from one end of the ridge to the other.…

Build Progress Demolition Phase 2 Timelapse Movies

Day 2 – Roof Tiles Flying Off!

Mar 10, 2012 Shaun

Day 2 sees the tiles come flying off with increasing speed. The technique is improving but it is time now to make a neat pile for the rubbish so we…

Build Progress Phase 2 Timelapse Movies

Shed Making Timelapse

Mar 9, 2012 Stephen

Here are 6 daily timelapse videos of the construction of the new shed.

Build Progress Demolition Phase 2

Day 1 of Roof Tiles Removal

Mar 8, 2012 Shaun

Today we started the demolition of the Old Place! The tiles on the roof starting from the top, working the way down, are being removed, one by one. No rushing!…

Build Progress Phase 2 Site Clearance Tidy Up

Shed Moved and Bloated!

Feb 25, 2012 Shaun

The shed has been successfully moved to its new location. We have bloated it up by adding two more 4feet wide (8feeet high) panels to the side walls to extend…

Build Progress Phase 1 Utilities

Phone Line Moved

Feb 14, 2012 Stephen

BT Openreach came and moved the phone line today, from the old house to the garage. The old line was overhead and the new line is underground. Engineer cut off…

Build Progress Phase 2

Utility Disconnect

Jan 28, 2012 Shaun

There are still two utility services connected to the Old Place, water and telephone. The electricity has been moved last November. For the water, we dug down near the meter…

Posts pagination

1 … 109 110 111 … 148

Roselea

A DIY Selfbuild by Stephen, Shaun & Daphne

Proudly powered by WordPress | Theme: Newsup by Themeansar.

  • Home
  • About
  • Contact Us
  • Design
    • Electricity
    • Energy
      • Solar Electricity
      • Solar Thermal
    • First Floor
    • Garage
    • Ground Floor
    • Ground Works
    • Roof
    • Site
    • Ventilation
    • Walls
    • Water
      • Rain Water
      • Sewage
  • Find Us
  • Pictures
    • Material Samples
    • Temporary Building
  • Plans
    • Structural Engineer Apr 2013
    • Groundworks September 2010
    • Building control May 2010
    • Planning April 10
    • Planning October 09
    • Planning August 2009
  • Tasks
  • Webcam Feed