Skip to content
  • Sat. Aug 16th, 2025

Roselea

A DIY Selfbuild by Stephen, Shaun & Daphne

  • Home
  • About
  • Contact Us
  • Design
    • Electricity
    • Energy
      • Solar Electricity
      • Solar Thermal
    • First Floor
    • Garage
    • Ground Floor
    • Ground Works
    • Roof
    • Site
    • Ventilation
    • Walls
    • Water
      • Rain Water
      • Sewage
  • Find Us
  • Pictures
    • Material Samples
    • Temporary Building
  • Plans
    • Structural Engineer Apr 2013
    • Groundworks September 2010
    • Building control May 2010
    • Planning April 10
    • Planning October 09
    • Planning August 2009
  • Tasks
  • Webcam Feed
Build Progress Phase 1 Temporary Accommodations

The Final Painting Task is finally done!

Oct 22, 2011 Shaun

The doorways in the corridor had their final white touch up done to create a nice and crisp edging around each door frame. We were talking today whether a little…

Build Progress Phase 1 Temporary Accommodations

Flooring Surface is Laid!

Oct 21, 2011 Shaun

The rooms in the temporary living quarters started having their final flooring laid down. A layer of 50mm polystyrene foam sheets, with two layers of 3.6mm hardboard on top. The…

Build Progress Phase 1 Temporary Accommodations

Final Day of Painting (Day 6)

Oct 21, 2011 Shaun

Bedroom 3 has all its four walls done in the pale purple colour. It turned out that only one coat was needed, apart from a little touch up on the…

Build Progress Phase 1 Temporary Accommodations

Day 5 of Paint, Paint and Paint!

Oct 20, 2011 Shaun

It was decided that the pinky yellow colour was still too yellow when painted on the walls. More red colour was mixed in and bedroom 1 had another coat to…

Build Progress Phase 1 Temporary Accommodations

Painting day 4

Oct 19, 2011 Shaun

Today we completed the lounge (the pale green and peach colours). The ceiling seems to be holding the white better now that we have covered the watermarks with the oil…

Build Progress Building Control Phase 1

Thumbs Up!

Oct 19, 2011 Shaun

Today we had a visit from Building Control, to inspect our latest work including our temporary living quarters. We talked of many different aspect of the build and our inspector…

Build Progress Phase 1 Temporary Accommodations

Painting Day 3

Oct 18, 2011 Shaun

All the ceilings (lounge, bedroom 1 to 3 and hallway) were painted with white vinyl matt (another old tin on the self!). The batten and edges of the new plasterboard…

Build Progress Phase 1 Temporary Accommodations

Day 2 of Painting

Oct 17, 2011 Shaun

The visuals were mixing colours from all our old pots of emulsion paint. We got a large quantity of yellow, a little of pale blue and also a little of…

Build Progress Phase 1 Temporary Accommodations

Corridor and Hall Painted

Oct 16, 2011 Shaun

The whole length of the Sun Corridor and Entrance Hall has been painted a glorious white! We found several pots of old white emulsion and mixed the whole lot together.…

Build Progress Phase 1 Temporary Accommodations

Smoothing Door holes

Oct 14, 2011 Shaun

We smoothed off the door holes in and out of the three bedroom and the larger opening that is the lounge. The cut-outs are quite rough with sawn edges and…

Posts pagination

1 … 112 113 114 … 148

Roselea

A DIY Selfbuild by Stephen, Shaun & Daphne

Proudly powered by WordPress | Theme: Newsup by Themeansar.

  • Home
  • About
  • Contact Us
  • Design
    • Electricity
    • Energy
      • Solar Electricity
      • Solar Thermal
    • First Floor
    • Garage
    • Ground Floor
    • Ground Works
    • Roof
    • Site
    • Ventilation
    • Walls
    • Water
      • Rain Water
      • Sewage
  • Find Us
  • Pictures
    • Material Samples
    • Temporary Building
  • Plans
    • Structural Engineer Apr 2013
    • Groundworks September 2010
    • Building control May 2010
    • Planning April 10
    • Planning October 09
    • Planning August 2009
  • Tasks
  • Webcam Feed