  • Sewage Processor Installation (First 2 days!)

    Day 1 and Day 2 of the Installation of our Sewage Processor!

    Saturday Day 1

    Finished off compacting the soil over the Leach field. The Sewage Processor’s location is calculated and first dig of hole!

    Sunday Day 2

    Finished digging the hole. Ensure the bottom (over 8feet deep!) is solid ready for the tank. Lifted the huge glass fibre and resin constructed monster, over 2 metres (6.5 feet) wide and weighs 230kg (500lbs) into the hole!!

    more tomorrow (fixing the tank with concrete and filling with gravel)