We have finished laying the laminated flooring!
Day 3 – Monday 20th June
The last 30% of the room took as long as the previous day’s work of covering 70%!
This part of the room had three doorways, little boxes and a toilet connector sticking out of the floor! The WC area needed the tiles to go backwards to match up the pattern but could not be clipped together until the whole area is calculated and cut! Fortunately it was only a small 1m by 0.6m (3feet by 2feet) area!
We are pleased in how it came out without any head scratching moments! We were lucky that the tiles kept quite straight and square to the whole building, with only a slight drift into the middle wall caused by the middle wall not being absolutely laser straight. It wobbled by 20mm in the worse spot around the doorway into the garage!
Now the step into the garage needs an Oak edging to protect the new tiles, and finally run a bead of sealant all around the edges.