For the start of the week, we started on Number 3 Energy Module this
afternoon (having had other commitments in the morning) by marking out the
boundary of the hole to dig. This one is much larger, measuring at 7 metres
long by 3 metres wide and the usual depth of 1.2 metres. This module stretches
across from underneath the kitchen, passes under the hallway and finishes up
under bedroom 1. It will hold about 8400 litres (about 1840 gallons) of water.

Module-3-Half-the-hole-dug

Module-3-Half-the-hole-dug


We have done about two third along the length of the hole, before we had a
stoppage! The dumper truck wouldn’t stop! But it was nearly the end of the
day anyway! Repair time!

Here’s today’s timelapse

By Shaun